Free Remodeling Estimate Generator

Create general remodeling estimates with line items for demo, framing, finishes, and multiple trades. Generate professional PDF estimates for any renovation project.

  • 21 pre-built remodeling line items
  • Professional PDF in under 5 minutes
  • 100% free — no signup required
Create Remodeling Estimate

Your Company Name

123 Main St

Estimate

Remodeling Line Items

Framing lumberper board ft
Drywallper sheet
Insulationper sq ft
Flooringper sq ft

+ 17 more items →

Total$X,XXX.XX
21 pre-built line items
Instant PDF download
Under 5 minutes to complete

Everything You Need to Estimate Remodeling Jobs

Built for contractors who want professional estimates without the learning curve

Remodeling Line Items

Pre-built items for framing, drywall, insulation, flooring, trim, doors, and windows — organized by materials, labor, and project management.

Multi-Trade Coordination

Separate labor lines for demo, framing, plumbing, electrical, drywall, flooring, painting, and trim in a single estimate.

Contingency Line

Built-in contingency field (10-15%) for hidden conditions like water damage, outdated wiring, or structural surprises.

Sub Cost + Markup

Show subcontractor costs with your GC markup so the management fee is transparent and justified.

Allowance Framework

Set per-unit allowances for owner selections — flooring, fixtures, hardware — while keeping the total budget clear.

Milestone Payments

Tie payment schedule to project phases so both sides have a shared definition of progress.

How to Create Your Remodeling Estimate

Three steps. Under five minutes. No account needed.

Step 1:

Select remodeling to load pre-built line items

Step 2:

Add quantities, prices, and company details

Step 3:

Professional estimate ready to send

What's Included: Remodeling Line Items

Pre-loaded line items so you don't start from scratch. Customize everything in the generator.

Materials

  • Framing lumber
  • Drywall
  • Insulation
  • Flooring

+ 5 more

Labor

  • Demo labor
  • Framing labor
  • Drywall labor
  • Plumbing (sub)

+ 4 more

Other

  • Design / architectural plans
  • Permit
  • Dumpster
  • Project management

Create your remodeling estimate now

All 21 line items pre-loaded. Fill in your prices, download as PDF.

Open Remodeling Generator

Free — no signup required

Who Uses This

Built for remodeling contractors and businesses of every size

Bathroom Renovations

Build detailed estimates for bathroom remodels with tile, plumbing, electrical, and fixture costs itemized.

Basement Finishing

Create estimates for unfinished basements covering framing, insulation, drywall, flooring, and egress windows.

Room Additions

Price out home additions with structural, mechanical, and finish costs across all trades in one document.

Whole-House Renovations

Generate comprehensive estimates for full-home remodels with per-room breakdowns and phased timelines.

Aging-in-Place Mods

Estimate accessibility upgrades — wider doorways, grab bars, walk-in showers — with code-compliant specifications.

Investment Properties

Build fast, standardized rehab estimates for flippers and landlords with cost-effective material selections.

Common Questions

How do I estimate remodeling costs?+

Break the project into phases: demo, structural, mechanical (plumbing/electrical/HVAC), finishes, and cleanup. Price each phase by materials and labor. Include a 10-15% contingency for unknowns. Whole-house remodels typically cost $100-$250 per sq ft; single-room renovations vary widely based on scope.

What markup should I charge for remodeling work?+

General contractors typically mark up 25-45% on remodeling projects. This covers project management, insurance, warranty, and profit. Markup on subcontractors is usually 15-20%. The more complex the project coordination, the higher your markup should be — customers are paying for your management expertise.

What should a remodeling estimate include?+

Include a detailed scope of work, itemized materials with allowances for owner selections, labor broken out by trade/phase, subcontractor costs, permits, dumpster/disposal, design fees if applicable, a contingency line item, project timeline, and payment schedule tied to milestones.

Why include a contingency in a remodeling estimate?+

Remodeling projects involve opening up existing structures where hidden conditions (water damage, outdated wiring, structural issues) are common. A 10-15% contingency covers these surprises without requiring a change order for every discovery. It protects both you and the homeowner from budget blowouts.

Stop guessing. Start estimating.

Professional remodeling estimates in under 5 minutes. Free, no signup required.

Create Free Remodeling Estimate