Free Remodeling Estimate Template

Create general remodeling estimates with line items for demo, framing, finishes, and multiple trades. Generate professional PDF estimates for any renovation project.

  • 21 pre-built remodeling line items
  • Fill-in estimate form with instant PDF download
  • 100% free — no signup required
Create Remodeling Estimate

Your Company Name

123 Main St

Estimate

Remodeling Line Items

Framing lumberper board ft
Drywallper sheet
Insulationper sq ft
Flooringper sq ft

+ 17 more items →

Total$7,238.00
21 pre-built line items
Instant PDF download
Under 5 minutes to complete

Sample Remodeling Estimate

A filled-in remodeling estimate example showing how to itemize materials, labor, and fees. Use it as a starting point, then swap in your own quantities and prices.

Living room & hallway remodel: flooring, trim, lighting, paint (450 sq ft)

Example
DescriptionQtyUnitUnit priceAmount
Luxury vinyl plank flooring500sq ft$3.25$1,625.00
Flooring underlayment500sq ft$0.40$200.00
Baseboard trim180linear ft$1.85$333.00
Recessed LED lights6each$45.00$270.00
Demolition (carpet & trim removal)450sq ft$0.80$360.00
Flooring installation450sq ft$2.50$1,125.00
Trim installation180linear ft$2.25$405.00
Lighting installation (electrician)6each$95.00$570.00
Interior painting1,100sq ft$1.75$1,925.00
Dumpster1each$425.00$425.00
Estimate total$7,238.00

Example pricing for illustration only. Material and labor costs vary by region, supplier, and job conditions.

Everything You Need to Estimate Remodeling Jobs

Built for contractors who want professional estimates without the learning curve

Remodeling Line Items

Pre-built items for framing, drywall, insulation, flooring, trim, doors, and windows — organized by materials, labor, and project management.

Multi-Trade Coordination

Separate labor lines for demo, framing, plumbing, electrical, drywall, flooring, painting, and trim in a single estimate.

Contingency Line

Built-in contingency field (10-15%) for hidden conditions like water damage, outdated wiring, or structural surprises.

Sub Cost + Markup

Show subcontractor costs with your GC markup so the management fee is transparent and justified.

Allowance Framework

Set per-unit allowances for owner selections — flooring, fixtures, hardware — while keeping the total budget clear.

Milestone Payments

Tie payment schedule to project phases so both sides have a shared definition of progress.

How to Create Your Remodeling Estimate

Three steps. Under five minutes. No account needed.

Step 1:

Select remodeling to load pre-built line items

Step 2:

Add quantities, prices, and company details

Step 3:

Professional estimate ready to send

What's Included: Remodeling Line Items

Pre-loaded line items so you don't start from scratch. Customize everything in the generator.

Materials

  • Framing lumber
  • Drywall
  • Insulation
  • Flooring

+ 5 more

Labor

  • Demo labor
  • Framing labor
  • Drywall labor
  • Plumbing (sub)

+ 4 more

Other

  • Design / architectural plans
  • Permit
  • Dumpster
  • Project management

Create your remodeling estimate now

All 21 line items pre-loaded. Fill in your prices, download as PDF.

Open Remodeling Generator

Free — no signup required

What to Include in a Remodeling Estimate

Remodeling estimates coordinate multiple trades — changes in one affect others. These tips keep projects on track:

  • Include a 10-15% contingency line item and explain why it's there. Once you open walls, you find surprises — water damage, outdated wiring, structural issues. Customers accept contingency when you frame it as protection, not padding.
  • Use allowances for owner selections ("Flooring allowance: $5/sq ft"). It gives customers a budget framework while keeping material choices flexible.
  • List project management as its own line item. Coordinating 4-8 trades is real work, and making it visible justifies your GC fee.
  • Break labor by trade: demo, framing, plumbing, electrical, drywall, flooring, painting, trim. For subbed-out work, show the sub cost plus your markup.
  • Don't forget permits, dumpsters, and temporary protection for finished areas. These "invisible" costs eat margins when you leave them off.
  • Include a project timeline tied to payment milestones. It sets expectations and gives both sides a shared definition of progress.

Who Uses This

Built for remodeling contractors and businesses of every size

Bathroom Renovations

Build detailed estimates for bathroom remodels with tile, plumbing, electrical, and fixture costs itemized.

Basement Finishing

Create estimates for unfinished basements covering framing, insulation, drywall, flooring, and egress windows.

Room Additions

Price out home additions with structural, mechanical, and finish costs across all trades in one document.

Whole-House Renovations

Generate comprehensive estimates for full-home remodels with per-room breakdowns and phased timelines.

Aging-in-Place Mods

Estimate accessibility upgrades — wider doorways, grab bars, walk-in showers — with code-compliant specifications.

Investment Properties

Build fast, standardized rehab estimates for flippers and landlords with cost-effective material selections.

Common Questions

How do I estimate remodeling costs?+

Break the project into phases: demo, structural, mechanical (plumbing/electrical/HVAC), finishes, and cleanup. Price each phase by materials and labor. Include a 10-15% contingency for unknowns. Whole-house remodels typically cost $100-$250 per sq ft; single-room renovations vary widely based on scope.

What markup should I charge for remodeling work?+

General contractors typically mark up 25-45% on remodeling projects. This covers project management, insurance, warranty, and profit. Markup on subcontractors is usually 15-20%. The more complex the project coordination, the higher your markup should be — customers are paying for your management expertise.

What should a remodeling estimate include?+

Include a detailed scope of work, itemized materials with allowances for owner selections, labor broken out by trade/phase, subcontractor costs, permits, dumpster/disposal, design fees if applicable, a contingency line item, project timeline, and payment schedule tied to milestones.

Why include a contingency in a remodeling estimate?+

Remodeling projects involve opening up existing structures where hidden conditions (water damage, outdated wiring, structural issues) are common. A 10-15% contingency covers these surprises without requiring a change order for every discovery. It protects both you and the homeowner from budget blowouts.

Stop guessing. Start estimating.

Professional remodeling estimates in under 5 minutes. Free, no signup required.

Create Free Remodeling Estimate