Free Bathroom Remodel Estimate Template

Build detailed bathroom remodel estimates with pre-built line items for tile, vanity, plumbing, fixtures, and labor. Download a professional PDF instantly.

  • 24 pre-built bathroom remodel line items
  • Fill-in estimate form with instant PDF download
  • 100% free — no signup required
Create Bathroom Remodel Estimate

Your Company Name

123 Main St

Estimate

Bathroom Remodel Line Items

Floor tileper sq ft
Wall tileper sq ft
Vanityper each
Toiletper each

+ 20 more items →

Total$8,380.00
24 pre-built line items
Instant PDF download
Under 5 minutes to complete

Sample Bathroom Remodel Estimate

A filled-in bathroom remodel estimate example showing how to itemize materials, labor, and fees. Use it as a starting point, then swap in your own quantities and prices.

Hall bath remodel, 5 x 8 ft, tub-to-shower conversion

Example
DescriptionQtyUnitUnit priceAmount
Demolition & disposal1each$900.00$900.00
Waterproofing & backer board1lot$450.00$450.00
Shower wall & pan tile100sq ft$8.00$800.00
Floor tile40sq ft$6.00$240.00
Tile installation labor140sq ft$14.00$1,960.00
Shower valve & trim1each$380.00$380.00
Vanity with top1each$750.00$750.00
Toilet1each$325.00$325.00
Glass shower door1each$950.00$950.00
Plumbing labor1each$1,400.00$1,400.00
Permit1each$225.00$225.00
Estimate total$8,380.00

Example pricing for illustration only. Material and labor costs vary by region, supplier, and job conditions.

Everything You Need to Estimate Bathroom Remodel Jobs

Built for contractors who want professional estimates without the learning curve

Bathroom Line Items

Pre-built items for tile, vanity, toilet, shower, plumbing, electrical, and waterproofing — organized by category.

Fixture Specifications

Fields for brand and model on every fixture so homeowners know exactly what's included in the price.

Tile Calculator

Separate floor and wall tile lines with per-square-foot pricing and waste factor built in.

Waterproofing Line

Dedicated waterproofing line item that shows code-compliant membrane work as a value-add.

Contingency Built In

Pre-configured contingency field for hidden conditions behind walls — standard on every bathroom project.

Phase Breakdown

Organize costs by project phase so the homeowner can see exactly what happens and when.

How to Create Your Bathroom Remodel Estimate

Three steps. Under five minutes. No account needed.

Step 1:

Select bathroom remodel to load pre-built line items

Step 2:

Add quantities, prices, and company details

Step 3:

Professional estimate ready to send

What's Included: Bathroom Remodel Line Items

Pre-loaded line items so you don't start from scratch. Customize everything in the generator.

Materials

  • Floor tile
  • Wall tile
  • Vanity
  • Toilet

+ 9 more

Labor

  • Demo labor
  • Plumbing rough-in
  • Electrical rough-in
  • Cement board installation

+ 4 more

Other

  • Permit
  • Disposal / dumpster
  • Temporary bathroom provisions

Create your bathroom remodel estimate now

All 24 line items pre-loaded. Fill in your prices, download as PDF.

Open Bathroom Remodel Generator

Free — no signup required

What to Include in a Bathroom Remodel Estimate

Bathroom remodels involve almost every trade in a small space — plumbing, electrical, tile, carpentry, paint. A detailed estimate prevents scope creep and misunderstandings.

  • Break the estimate into phases: demo, rough-in (plumbing + electrical), waterproofing, tile, fixture installation, and finish work. This matches how the project actually flows.
  • Specify fixtures by brand and model (e.g., "Kohler Cimarron toilet, K-3609"). Owners research products — vague descriptions invite disputes about what's "included."
  • Tile is the biggest variable. Price tile per square foot for floor and wall separately, and include backer board, waterproofing, thinset, and grout as separate lines. Don't forget a 10-15% waste factor for cuts.
  • Include waterproofing as its own line item. Shower waterproofing is code-required and a common source of callbacks — show the client you're doing it right.
  • Add a contingency line (10-15%). Opening up bathroom walls almost always reveals surprises: water damage, outdated plumbing, or inadequate framing.
  • Note the project timeline clearly. Bathroom remodels make a household uncomfortable — clients want to know exactly how many days they'll be without a functioning bathroom.

Who Uses This

Built for bathroom remodel contractors and businesses of every size

Full Gut Remodels

Estimate complete bathroom overhauls from demo to final fixture installation across all trades.

Shower / Tub Replacements

Create focused estimates for shower-to-walk-in conversions or tub-to-shower swaps.

Vanity & Countertop Upgrades

Build estimates for vanity replacement, countertop upgrades, and faucet installation.

Tile Work Only

Generate tile-focused estimates for floor and wall retiling with waterproofing included.

ADA / Accessibility

Estimate grab bar installation, walk-in showers, and comfort-height fixtures for accessibility projects.

Multi-Bathroom Projects

Price out two or three bathrooms at once with per-bathroom breakdowns and shared mobilization costs.

Common Questions

How do I estimate bathroom remodel costs?+

Start with the fixture selections (vanity, toilet, shower/tub, tile) since these drive most of the material cost. Add plumbing and electrical rough-in labor, tile installation labor, and finish work. Include demo, disposal, waterproofing, and permits. Most bathroom remodels range from $10,000-$30,000 depending on size and fixture quality.

What markup should I charge for bathroom remodels?+

Bathroom remodel contractors typically charge 30-50% markup over direct costs. Higher markups are justified on full gut remodels because of the coordination complexity across plumbing, electrical, tile, and finish trades. Simpler vanity-and-paint refreshes carry lower markups (20-30%).

What should a bathroom remodel estimate include?+

A professional bathroom estimate should include all fixtures by brand and model, tile with sq ft measurements, plumbing and electrical labor, waterproofing, demo and disposal, permits, a contingency line for hidden conditions, a project timeline, and payment terms. Specify what the homeowner is providing vs. what you're furnishing.

How do I write a professional bathroom remodel estimate?+

Organize by phase: demo, rough-in, waterproofing, tile, fixture installation, finish. List every fixture and material with brand, model, and unit cost. Include allowances for owner selections that haven't been finalized yet. Use DocJoist to generate a clean PDF that covers every detail.

Stop guessing. Start estimating.

Professional bathroom remodel estimates in under 5 minutes. Free, no signup required.

Create Free Bathroom Remodel Estimate