Free Kitchen Remodel Estimate Template & Generator

Build kitchen remodel estimates with line items for cabinets, countertops, backsplash, and all trades. Generate a detailed PDF estimate for any kitchen renovation.

  • Pre-built kitchen remodel line items
  • Instant PDF download
  • Professional formatting
  • No signup required

Your Company Name

123 Main St

ESTIMATE

Kitchen Remodel Line Items

Cabinetsset
Countertopssq ft
Backsplash tilesq ft
Sinkeach
Fauceteach

+ 16 more items...

Total: $X,XXX.XX

21 pre-built line items
Instant PDF download
Under 5 minutes to complete

What to Include in a Kitchen Remodel Estimate

Kitchen remodel estimates are the most complex residential estimates you'll write — they involve multiple trades, expensive materials, and decisions that affect the homeowner's daily life for weeks. A thorough estimate prevents scope creep and sets realistic expectations.

Materials

Cabinets are typically the largest single cost (30-40% of the total). Specify the cabinet line, door style, and finish. List countertops by material and square footage (granite, quartz, laminate). Include backsplash tile, sink, faucet, hardware, flooring, lighting, and paint. Note whether appliances are included or owner-supplied.

Labor

Break labor into phases: demo, plumbing rough-in, electrical rough-in, cabinet installation, countertop installation (usually by the fabricator), tile work, painting, and trim. Each phase may involve a different subcontractor. Include project management time if you're the GC coordinating multiple trades.

Markup & Overhead

General contractors typically mark up kitchen remodels 25-40% for overhead and profit. If you're subbing out work, your markup on subs is usually 15-20%. The project management involved in coordinating 4-6 trades justifies a higher markup than single-trade work. Cabinet and countertop markup is typically 20-30% over your dealer cost.

Common Mistakes

Don't underestimate demo time and cost. Include a dumpster. Note any structural work (removing walls, adding headers) as a separate line item — it's a common add-on that can blow the budget if not planned. Specify what's excluded (appliances, window treatments, etc.) to prevent scope disputes.

Common Kitchen Remodel Estimate Line Items

Materials

ItemUnit
Cabinetsset
Countertopssq ft
Backsplash tilesq ft
Sinkeach
Fauceteach
Hardware / handleseach
Flooringsq ft
Lighting fixtureseach
Paintgallon

Labor

ItemUnit
Demo laborhour
Plumbing rough-inhour
Electrical rough-inhour
Cabinet installationhour
Countertop installationhour
Tile installationsq ft
Paintinghour
Trim / finish workhour

Other

ItemUnit
Design consultationeach
Permiteach
Appliance installationeach
Dumpstereach

Ready to create your kitchen remodel estimate?

Pre-loaded with all the line items above. Fill in your numbers, download as PDF.

Create Kitchen Remodel Estimate

Frequently Asked Questions: Kitchen Remodel Estimates

How do I estimate kitchen remodel costs?

Break the project into categories: cabinets (30-40% of budget), countertops (10-15%), labor (20-35%), appliances (if included), flooring, backsplash, and fixtures. A mid-range kitchen remodel typically costs $25,000-$60,000; high-end renovations can exceed $100,000. Always include permits and design fees.

What markup should I charge for kitchen remodels?

General contractors typically mark up kitchen remodels 25-40%. The complexity of coordinating multiple trades (plumbing, electrical, tile, cabinets, countertops) justifies a higher markup than simple single-trade jobs. Markup on subcontractors is usually 15-20%; materials markup is 20-30%.

What should a kitchen remodel estimate include?

Include itemized materials (cabinets, countertops, backsplash, fixtures, flooring, paint), labor by trade/phase, demo and dumpster costs, permits, design fees, appliance installation (if applicable), and a detailed scope noting what's included and excluded. Include a project timeline.

How long does a kitchen remodel take?

A typical full kitchen remodel takes 6-10 weeks from demo to completion. Cabinet lead times (4-8 weeks for custom, 2-4 weeks for semi-custom) often determine the overall timeline. Include the timeline in your estimate so customers can plan around being without a kitchen.